Skip to content
Biotherm Heat AB – to the home page Contact
+46 (0)921-578 00info@biothermheat.com

Guide 13Costs and projects

Replace oil or gas with wood chips and pellets

There are two ways to move away from oil or gas: keep the boiler and replace the burner, or change to a new wood chip boiler. Both burn wood chips and pellets.

Reading time approx. 2 minAll guides in the knowledge base

The PelleTech BU wood chip burner connected to an industrial boiler in a bright industrial hall

Two routes away from oil and gas.

Keep the boiler

  • The PelleTech BU wood chip burner connects to your existing industrial boiler and replaces the oil or gas burner.
  • For boilers for water, steam or thermal oil.
  • Eight sizes, 200 kW–2.2 MW.
  • We supply the fuel store and feed system around the boiler.

Change to a new boiler

  • The Multiauto wood chip boiler for 20–200 kW, or the IDRO industrial boiler for 200 kW–4.6 MW.
  • The boiler can stand in the existing boiler room, in a container or in a heating plant.
  • Many switch from gas, oil or electricity.
  • IDRO can have bio-oil as a backup in the same boiler body.

How the wood chip burner works.

The PelleTech BU wood chip burner on its own: the burner chamber with the burner throat on the left and the feed system on the right

The fuel is fed through a burn-back protection device and a stoker screw onto a moving grate. It burns out in the burner's own chamber, which has a refractory double wall – and the flame and hot gases are blown through the burner throat into the boiler's firebox. The boiler heats the water, steam or oil just as before.

Output
200 kW–2.2 MW, eight sizes
Burner throat
Ø 340–980 mm
Wood chips
Up to P45S
Ignition
Moisture content up to W50
Above 500 kW
Hydraulic drive, twin stoker screws
Fuel
Wood chips and pellets

The fuel costs less.

With bought-in wood chips the fuel costs approx. SEK 0.30/kWh, and with wood chips from your own forest SEK 0.15–0.20. Compare that with what oil or gas costs you per kilowatt hour today. At the same time, you become less dependent on a single fuel: a wood chip boiler burns whatever is cheapest and easiest to get hold of.

How to work out the cost

How the switch works.

  1. 01

    Heat-load calculation

    We go through the boiler, the heating demand and the fuel you can get hold of. The first step is free of charge.

  2. 02

    Choosing the route

    A wood chip burner for the existing boiler, or a new wood chip boiler – and which fuel store suits the site.

  3. 03

    Design and engineering

    The burner, the fuel store and the feed system are engineered for your boiler and your boiler room, in 3D.

  4. 04

    Installation

    Assembly, commissioning, fine-tuning and training.

Read next

More guides.

All guides in the knowledge base

Free heat-load calculation

Let's calculate your heating.

Tell us what needs heating and we will calculate it for you – the heat-load calculation is free of charge.

Call +46 (0)921-578 00

info@biothermheat.comVästerås · Luleå

Free heat-load calculation

Let's calculate your heating.

Tell us briefly about your plant and we will get back to you. The first step is free of charge.

We use your details to handle your enquiry. Read our privacy policy.

Cookie settings

Choose what may be loaded and stored.

Read more in the privacy policy