What a heat-load calculation involves

The first step is free of charge. The heat-load calculation gives you a basis for your decisions, before anything is built.

Reading time approx. 2 minAll guides in the knowledge base

3D line drawing of a heating plant with the boiler visible through the wall

What do we calculate?

In the heat-load calculation we work out what output you need, how much fuel you will use and which plant suits you – boiler, fuel store and accumulator tank.

The right output is the foundation. A boiler that is too small will not be enough on the coldest days, and one that is too large spends much of its time at low load. The heat-load calculation gives you a basis for comparison with what you have today, before you decide.

What we need to know.

  • What needs heating. The buildings and premises, and whether the heat will also go to hot water, drying or a process.
  • How you heat today. Your current boiler or heat source, and its consumption if you have the figures.
  • The fuel. Which wood chips, which pellets or which other fuel you can get hold of.
  • The site. Where the boiler and fuel store can stand, and how you want to fill the store.

Six steps to heat.

  1. 01

    Needs analysis

    We go through your heating needs, your fuels and your premises. The heat-load calculation is free of charge.

  2. 02

    Design and engineering

    Calculations, 3D drawings in IRONCAD, system documentation, and engineering and design drawings.

  3. 03

    Manufacturing

    We manufacture screws, fuel stores and our own plants ourselves, adapted to your particular site.

  4. 04

    Installation

    Assembly, commissioning and fine-tuning – the plant is handed over ready to run.

  5. 05

    Training

    We teach you how the plant works and provide operation and maintenance manuals.

  6. 06

    Service

    Once or twice a year, with alarms, remote monitoring and remote control.

The whole project, or parts of it.

The boiler room is drawn in 3D and 2D with heating, plumbing and electrical drawings, and at commissioning you receive documented training. We can take on the whole project as main contractor, with buried pipework, chimney and substations, or just parts of it – local plumbing and electrical firms can also do the installation.

Heating plant in cross-section from the 3D model: the industrial boiler with the flame on the grate, the flue gas fan and the feed system
Every plant is drawn in 3D before it is manufactured.

Read next

More guides.

All guides in the knowledge base

Free heat-load calculation

Let's calculate your heating.

Tell us what needs heating and we will calculate it for you – the heat-load calculation is free of charge.

Call +46 (0)921-578 00

info@biothermheat.comVästerås · Luleå

Free heat-load calculation

Let's calculate your heating.

Tell us briefly about your plant and we will get back to you. The first step is free of charge.

We use your details to handle your enquiry. Read our privacy policy.

Cookie settings

Choose what may be loaded and stored.

Read more in the privacy policy