Option
Electrostatic filter
Built into the boiler beneath the convection section – no external filter unit. Lower cost and more compact.
Cookies and chat
The website has no statistics of its own and no advertising cookies. The chat is provided by Weply and stores data in your browser, including for Weply's statistics. It only loads if you accept. More in the privacy policy
Fully automatic and water-based, for pellets, wood chips and residues – with bio-oil as backup in the same boiler body.
200kW–4.6MWOutput range
PelleTech is now part of BWT
General agent in Scandinavia · Biotherm Heat AB
01Industrial heating
When a process, a greenhouse or a hotel depends on heat, the boiler has to run – around the clock, all year round. IDRO is built for exactly that.
02Fuels
IDRO burns dry and moist fuels, even lower-quality ones, in one and the same boiler. Pellets and wood chips are the most common – but you are never tied to one fuel.
Wood chips from the forest, sawdust from the sawmill and industry's own residues: the fuel is renewable and often close at hand – and what is left over in production becomes heat on site.
03Exploded view
The casing, door, ash boxes and feed system of the IDRO 500 – plus the firebox and stepped grate, which sit inside the boiler. Point at a part to see what it does.
Frequency-controlled, for the right draught through the boiler.
On the front: temperature, output, fuel and oxygen content.
Sensors and ceramics are accessed through simple hatches.
100 and 84 litres, for the firebox and convection section.
Ceramic-lined and water-cooled.
Moving. Slides out on a rail for servicing.
Protects against burn-back and shears off long sticks.
Feeds the fuel in. Energy-efficient motor and gearbox.
04The cascade
Up to four boilers work together. Four IDRO 500 boilers deliver up to 2 MW – four IDRO 1150 boilers up to 4.6 MW.
Boilers in cascade
Choose the number of boilers – with the mouse or the arrow keys.
With IDRO 500 · 500 kW per boiler
2MW
With IDRO 1150 · 1,150 kW per boiler
4.6MW
Need less than 200 kW? See all wood chip boilers, from 20 kW
05How IDRO works
The fuel burns out on the grate, and the heat passes into the boiler water. The ash screws carry the ash out of the firebox and convection section.
1
2
3
4
5
06Combustion
The grate is made of high-chromium cast iron. Its bars move back and forth, and slightly up and down, breaking up the fuel bed and carrying the fuel forward until only ash remains. That is why IDRO also handles wetter and lower-quality fuels – with no risk of sintering.
The fuel dries where it enters the grate.
The bed is kept moving and burns out zone by zone.
Drops into the ash screw and is removed automatically.
07The rest of the boiler
From ignition to flue gases.
EfficiencyUp to 94.6 %, according to PelleTech.
In operation
Built for long operating periods. The grate and convection section are cleaned automatically, and the ash is removed on its own. When servicing is needed, it is quick.

High-chromium cast iron. Pulls out of the boiler in under 15 minutes.
The stoker screw's gearbox and motor draw 0.37 kW.

Fast ignition at 1,600 W. Replaceable ignition elements.

Measures the oxygen content and adjusts combustion.
08Options
Option
Built into the boiler beneath the convection section – no external filter unit. Lower cost and more compact.

Option
Separates dust from the flue gases, with a container below.

Option · 2 × 0.37 kW
An inclined screw lifts the ash all the way out of the boiler room, into a shared container.
09Control and connectivity
The touchscreen sits on the boiler. With the app or via Modbus, you can monitor and control IDRO remotely – and alarms reach you directly.
Temperature, output, fuel and oxygen content.
Monitor and control from your own system.
Phone or tablet.
Alarms, remote monitoring and remote control.
Monitor and control the boiler remotely, wherever you are. An internet connection for alarms and information is available as an option – and the cascade control runs several boilers and the accumulator tanks in one system.
The values shown are examples.
10Peace of mind, around the clock
Safety is built in – from the rotary valve that shuts out burn-back to the flue gas fan that keeps the draught right. And the boiler tells you itself when it needs servicing.
11Add-ons
The boiler is part of the plant. Shredder, heating plant and fuel store come from us – engineered, installed and serviced, with one contact all the way.
Each store is designed around your conditions and wishes – the site, the fuel and how you want to fill it. Besides PelleTech's solutions, we manufacture a range of fuel stores ourselves.







12Sizes and data
Seven from 200 to 500 kW, plus a larger boiler of 700–1,150 kW. Every plant is engineered for its specific task.
| Output, kW | 200 | 250 | 300 | 350 | 400 | 450 | 500 | 700–1,150 |
|---|---|---|---|---|---|---|---|---|
| Dimensions, mm | Data on request | |||||||
| Boiler length | 2,090 | 2,295 | 2,295 | 2,604 | 2,604 | 2,604 | 2,604 | |
| Flue gas side | 332 | 332 | 332 | 462 | 462 | 462 | 462 | |
| Chip feeder | 896 | 896 | 896 | 896 | 896 | 896 | 896 | |
| Boiler depth | 1,214 | 1,299 | 1,299 | 1,491 | 1,491 | 1,491 | 1,491 | |
| Depth with ash boxes | 1,515 | 1,600 | 1,600 | 1,793 | 1,793 | 1,793 | 1,793 | |
| Overall height | 2,101 | 2,216 | 2,216 | 2,414 | 2,414 | 2,414 | 2,414 | |
| Boiler height | 1,899 | 2,011 | 2,011 | 2,145 | 2,145 | 2,145 | 2,145 | |
| Technical data | ||||||||
| Water volume, litres | 617 | 772 | 772 | 1,100 | 1,100 | 1,100 | 1,100 | |
| Operating pressure min/max, bar | 1.5/4 | 1.5/4 | 1.5/4 | 1.5/4 | 1.5/4 | 1.5/4 | 1.5/4 | |
| Max. operating temperature, °C | 95 | 95 | 95 | 95 | 95 | 95 | 95 | |
| Flow and return | 3″ DN 80 | 3″ DN 80 | 3″ DN 80 | 4″ DN 100 | 4″ DN 100 | 4″ DN 100 | 4″ DN 100 | |
| Filling and draining | 1¼″ DN 32 | 1¼″ DN 32 | 1¼″ DN 32 | 1¼″ DN 32 | 1¼″ DN 32 | 1¼″ DN 32 | 1¼″ DN 32 | |
| Minimum flow, t 15 K, kg/h | 11,400 | 14,250 | 17,150 | 19,990 | 22,850 | 25,700 | 28,600 | |
| Accumulator tank, min., litres | 3,000 | 4,000 | 4,000 | 5,000 | 5,000 | 5,000 | 5,000 | |
| Heat exchanger surface, m² | 12.48 | 14.9 | 14.9 | 25.43 | 25.43 | 25.43 | 25.43 | |
| Flue gas tubes, Ø 70, pcs | 64 | 72 | 72 | 132 | 132 | 132 | 132 | |
| Grate combustion area, m² | 0.24 | 0.375 | 0.375 | 0.617 | 0.617 | 0.617 | 0.617 | |
| Firebox volume, m³ | 0.08 | 0.15 | 0.15 | 0.3 | 0.3 | 0.3 | 0.3 | |
| Ash boxes, firebox/convection, litres | 100/84 | 100/84 | 100/84 | 100/84 | 100/84 | 100/84 | 100/84 | |
| Flue pipe, Ø mm | 250 | 250 | 250 | 300 | 300 | 300 | 300 | |
| Boiler weight, kg | 1,950 | 2,500 | 2,500 | 3,200 | 3,200 | 3,200 | 3,200 | |
Dimensions apply to 200–500 kW with chip feeder. Data according to PelleTech's technical specification, subject to change. Final data for your plant is provided at the design stage.
Biotherm designs and engineers the boiler room in 3D (IRONCAD) and handles installation, commissioning and fine-tuning.
Minimum clearances around the boiler, 200–500 kW

The larger boiler
For the largest needs, IDRO comes as a larger boiler of 700–1,150 kW – and with four 1,150 kW boilers in cascade, a plant reaches up to 4.6 MW. Dimensions and data on request; every plant is engineered for its specific task.
13PelleTech and BWT
PelleTech, which manufactures Multiauto, IDRO, AERO and BU, has been acquired by BWT, Best Water Technology. Biotherm Heat AB is the general agent for PelleTech in Scandinavia.
The brochure
PDF · 24 pages · 4.3 MB
Free heat-load calculation
Tell us what needs heating and which fuel you have close at hand, and we will calculate IDRO for you – one boiler or several in cascade.
info@biothermheat.comVästerås · Luleå